First Baptist Church in Tacoma - Sound Booth Overhaul
Phase One of the overhaul was to move the monitors amps down to the platform. We did that in Nov ’09. The amps for the mains are still in the booth (as you can see on the audio rack on the right side of the booth).
Phase Two - the design, construction, fabrication and install of new booth.
Once the install is done I will post an update.